Sign up for the mailing list

Join our mailing list to receive updates and alerts via email

Your email address has been added to our mailing list. Thank you for your interest.

Project Overview

Project Background

The Aptakisic Road study area is comprised of approximately 1.2 miles from Illinois Route 83 on the west to Buffalo Grove Road on the east. The study area contains a mixture of residential, commercial and institutional land uses, and is located within the village limits of both Long Grove (west half) and Buffalo Grove (east half). The existing roadway varies from a two-lane rural section to multi-lane urban sections near the Illinois Route 83 and Buffalo Grove Road intersections. LCDOT has identified that current traffic volumes in this corridor are near the capacity of the existing roadway, and that additional development and lack of alternate routes will add to capacity demands. The proposed scope of work will be determined through engineering evaluation and public involvement.

The Aptakisic Road Study is being prepared utilizing the principles of Context Sensitive Solutions (CSS) which will include extensive public involvement and outreach efforts. The study is scheduled to be completed May 2015 with Design Approval the summer of 2015.